Arched gravity concrete dam: stability by a combination of gravity and arch Arch opening angle: 116 deg, H = 95 m, L = 270 m, e = 3.50 m, E = 42 m Catchment: 530 km2 Reservoir capacity: 155 Mm3 River: Agri Purpose: flood control, hydropower and drinking water supply (for Taranto, Bari...) Spillway system: tunnel spillway on left bank
POLYTECHNIC UNIVERSITY OF BARI DICATECh Department of Civil, Environmental, Land, Building Engineering and Chemistry
Via E. Orabona, 4 - 70125 Bari - ITALY www.dicatech.poliba.it
LIC Coastal Engineering Laboratory Area Universitaria di Valenzano
Strada Provinciale
Valenzano - Casamassima, Km 3, 70010 Valenzano, BARI- ITALY www.poliba.it/lic